Permits here go through the City of Malibu, where Building Safety takes requests for building, excavation and pool permits through the city's online Development Portal. Some projects also need Planning Department approval, and the order of those reviews often sets the start date more than our crew does. Before I price a job, I look into what the city asks for at your address and tell you what I found. Where approvals are needed, we plan the start around them and can handle the concrete side of the paperwork or work alongside your architect or engineer. We're fully licensed and insured, and for questions about your own lot, the city has the final word.
The city's design figures for building here assume rain falling at 2 inches an hour. That's a city-wide number, not one for your parcel, but it tells you what a winter storm can do, and here those cool, wet winters follow long, dry summers. So I check where the water runs before anything else and slope the slab away from the house. We also dig out and pack the subgrade, the ground the slab sits on, so it doesn't settle with the dirt. In summer we start pours early, because midday heat dries the top too fast and leaves it weak and dusty later. The price moves with the size of the area, how much old concrete comes out, how deep the base goes, the rebar and the finish. Access can matter as much as size when a truck can't reach the back of the lot. The schedule turns on approvals and weather. We do the same work in Calabasas, and either way your estimate puts all of it in writing.